in

UNAM pedestrian bridge: began the assembly of the structu

UNAM pedestrian bridge: began the assembly of the structu

The Provincial Department of Roads reported that began the assembly of the prefabricated concrete pieces that will make up the major structure of the pedestrian bridge on the national route No. 12 in front of the Campus of the National University of Misiones.

Columns, slabs, staircases and ramps arrived at the construction site coming from the province of Córdoba, where the company PRETENSA built them according to the measures and design requested.

Previously, the bases were built that are located in the central masonry of Juan Domingo Perón avenue and in the UNAM premises.

The work is financed entirely by the government of Misiones and aims to ensure the crossing of pedestrians over the road, without risks to physical integrity.

On April 25, 2018, the president of the DPV Leonardo Stelatto informed the project to students, to the authorities of the university and neighbors of the place, who will use it frequently.

The put up UNAM pedestrian bridge: began the assembly of the structure appeared first on MisionesOnline .

What do you think?

0 points
Upvote Downvote

Total votes: 0

Upvotes: 0

Upvotes percentage: 0.000000%

Downvotes: 0

Downvotes percentage: 0.000000%

Leave a Reply

Your email address will not be published. Required fields are marked *

A short circuit would have been the cause of the fire in the Notre Dame Cathedral

A short circuit would have been the cause of the fire in the Notre Dame Cathedral

Argentine Basketball League: OTC play-offs begin

Argentine Basketball League: OTC play-offs begin